As Enbridge Races to Build Line 3 Pipeline, Resistance Ramps Up in the Courts and On the Ground

The company is responsible for the 2010 Kalamazoo River oil spill that leaked nearly one million gallons from a tar sands pipeline, as well as a 1991 …